Sign In | Join Free | My hardware-wholesale.com
hardware-wholesale.com
Products
Search by Category
Home > Other Processing Services >

Production Line Upgrade/Automotive EPC

Categories Automotive EPC
Brand Name: CEI-Kinte
Model Number: Customized
Certification: ISO9001/FEM/ISO14001/OHSAS 18001
Place of Origin: China
MOQ: Negotiable
Price: Negotiable
Payment Terms: Negotiable
Supply Ability: Strong production capacity
Delivery Time: According to customer's requirement
Packaging Details: Packed with plastic films and wrap with strips
EPC: Engineering Procurement Construction
Press Shop: Consulting
Body Shop: Main/Closures/Floor/Sub-assembly/Metal finishing
Paint Shop: PT/ED Line/Primer Top Paint
Assembly Shop: Trim/Sub-assembly/Testing
Engineering: Plant Planning, R&D, SE
Production capacity: Improvement
Simulation: PDPS
Overall Planning: General Layout, Analysis Drawings
After-sale Service: 24/24 7/7
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Production Line Upgrade/Automotive EPC

Introduction Of New Models

Introduction of new models for welding lines, to realize collinear production of new models and original models


Capacity Improvement

Improvement of line productivity, to convert and upgrade the low-beat lines to high-beat lines


Old Line Relocation

Introduction of new models for welding lines, to realize collinear production of new models and original models


Manual Operation Converted To Automatic Operation

Change manual operation to automatic operation. Transform the manual loading station into automatic loading station. Transform the manual welding station into automatic welding station. Transform the manual gluing station into automatic gluing operation, etc.


Intelligent Transformation

By incorporating MISP industrial big data system, the line beats can be optimized and the failure rate can be lower.


TRANSFORMATION PROCESS

01 Preparation Before Transformation

1. Full demonstration and innovation of process plan

2. Sufficient on-site surveying and mapping, logistics confirmation

3. Detailed construction plan

4. Rigorous project plan

5. Personnel and materials management

6. Standard project management; standard documents, SAP


02 Management During Transformation

1. Mobilization before construction

2. Daily work arrangement and confirmation

3. Safety management

4. Emergency plan

5. Logistics support, customer support, logistics support, customer support


03 Summary After Transformation

1. 24-hour production accompany

2. Quick response to problem points

3. Summary and standardization


Quality Production Line Upgrade/Automotive EPC for sale
Send your message to this supplier
 
*From:
*To: Guangzhou Kinte Electric Industrial Co., LTD
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0