Sign In | Join Free | My hardware-wholesale.com |
|
Categories | Lost Foam Mould |
---|---|
Brand Name: | Liushi |
Certification: | ISO 9000 |
Place of Origin: | China Luoyang |
MOQ: | 1 Piece |
Payment Terms: | T/T |
Delivery Time: | 30-45 days |
Packaging Details: | Wooden Boxes |
Process: | Lost Foam Mould |
Product Name: | EPS Foam Mould |
Service: | AutoCAD DXF DWG |
Mould Life: | 50,000-100000 Shots |
Material: | Ductile iron / Grey Iron |
Other Name: | Lost Wax Sand Casting |
Customized: | Yes |
Specification: | Customized |
Experience: | Over 20 years |
Company Info. |
LUOYANG LIUSHI MOULD CO.,LTD |
Verified Supplier |
View Contact Details |
Product List |
AutoCAD DXF DWG Lost Foam Mould Al7075 Lost Wax Sand Casting
We can supply various casting parts (OEM) according to the customers’ drawings and requirements. Please offer us your enquiry with detailed drawings, specifications, unit weight, quality requirements and pictures. We will supply you not only the products with good quality but also competitive price.
PROCESS | MATERIAL | |
Lost Foam Casting | Ductile Iron / Grey Iron Carbon steel 1025 to 1045 ASTM 60-40-18 / 65-45-12 / 80-55-06 / 100-70-03 Austempering ductile iron Heat resistant steel / Wear resistant steel | |
Sand Casting | Green Sand | Grey Iron, Ductile Iron, Malleable Iron, Stainless Steel, Carbon, Steel, Aluminium, |
Furan Resin Sand | ||
Cold Harden Resin Sand | ||
Die Casting | Low Pressure Die Casting | Aluminum, Carbon steel,Steel |
Gravity Pressure Die Casting | ||
Surface Finish | Shot blast, chromate plating, power coated and anodizing | |
Machining | Lathe, planer, drilling machine, tapping machine, line cutting, milling machine, CNC machining center. | |
Inspection | Test equipment: Optical Spectrum Analyzer, CMM, Hardness test equipment, Tensile test machine. |
Product Scope
Auto Parts Casting
Pump & Valve Casting
Transmission Gear Box
G.E.T. (Teeth & Adaptor) Casting Parts
Hydraulic Machine Castings
Mining Machinery Casting Parts
Railway & Train Casting Parts
Advantages:
1. Competitive Price
2. Quick Delivery time(2-4 weeks)
3. ISO Certificated with the srtictest quality control system
4. 23 Years OEM&ODM Mould-making processing experience
5. Advanced equipment and Skilled workers
![]() |