Sign In | Join Free | My hardware-wholesale.com
hardware-wholesale.com
Products
Search by Category
Home >

St 200 Crawler Mounted Drill Rig Rocky Hard Layers Speed Blasting Machine

Categories Crawler Mounted Drill Rig
Brand Name: ShiTan
Model Number: ST200
Certification: ISO
Place of Origin: China
MOQ: 1 set
Price: USD46000/set
Payment Terms: T/T, Western Union
Supply Ability: 2000sets/month
Delivery Time: 5 days after advance payment
Packaging Details: 1*20 FCL
Drilling Rig Product Name: ST 200 Rubber Crawler Mounted Drill Rig
Drilling type: multifunction
Mobility: crawler
Drilling unit: tophammer
Feeding type: hydraulic
Drilling diameter: 140-200mm
Drill rod diameter: 76/89
Swing speed: 45-70rpm
Swing torque: 3500-4800N.M
Drill rod length: 1.5m 2.0m 3.0m
Drilling Depth: 200 meters
OEM: available
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

St 200 Crawler Mounted Drill Rig Rocky Hard Layers Speed Blasting Machine

ST 200 Customized Crawler Mounted Drilling Rig


ST 200 Crawler Mounted Drill Rig Product Description


The drilling rig is a highly efficient and versatile drilling rig that is mainly used to drill wells, agricultural irrigation wells, ground heat pump wells and other wells. It is especially suitable for water intake projects in mountainous and rock formations.. The new hydraulic rig technology, supporting high hydraulic torque and a large rotating hydraulic propulsion diameter. Centralized control of the hydraulic console for easy operation. This series of platforms uses excavator crawler chassis for off-road performance.


ST 200 Crawler Mounted Drill Rig Technical Parameters


1Drilling depth (m)200
2Drilling speed10~35m/h
3Engine power(kw)77
4Rotary torque (N*m)4200~5600
5Rotary speed (rpm)48~70
6Drill bit diameter (mm)Ø90~Ø315
7Lifting force (Ton)12
8Lift speed(m/min)2.5
9Max lift speed(m/min)18
10Propulsion force (kN)4
11Walking speed (km/h)0~2.5
12Hydraulic outrigger stroke(m)1.5
13Climbing ability (°)20
14Working air pressure (MPa)1.05~2.46
15Total air consumption (m3/min)16~30
16Drill pipe diameter (mm)Ø76
17Drill pipe length (mm)3000
18Whole weight (kg)4700
19Machine size (mm)3600*1700*2150
20Working conditionsSoil layer and bedrock layer


ST 200 Crawler Mounted Drill Rig Product Features


1.Small profile for easy access to narrow job sites.
2.Simple but reliable design with adequate rotary torque and lifting force for widely used for civilian market.
3.Hoist and winch able to lift drill tools and accessories up to 1,500kg,much reducing workload of operators.
4.Rotation with two speed adjustable for different hole ranges and rock conditions.

Drilling Rig Product Service


Before sales: Engineering Consultance Service & Technical Support;
After sales: Process clients' feedback and or problems during the operation of the machines within 24 hours;
OEM service: We accept OEM orders and 70 percent of our clients are enjoying OEM services;


What aspects should we pay attention to in the drilling process ?


Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.



Quality St 200 Crawler Mounted Drill Rig Rocky Hard Layers Speed Blasting Machine for sale
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0