Sign In | Join Free | My hardware-wholesale.com
hardware-wholesale.com
Products
Search by Category
Home > Other Machinery & Industry Equipment >

Photovoltaic Modules Hail Impact Tester Equipment IEC61215 Standard

Categories Environmental Test Chambers
Brand Name: KingPo
MOQ: 1
Place of Origin: China
Certification: ISO 17025 Calibration certificate
Price: To be quoted
Packaging Details: safety wooden box
Delivery Time: 30 working days
Payment Terms: 100% TT in advance
Supply Ability: 3 units per month
pressure: 6 ~ 8 bar
barrel length: about 940 mm
X axis movement distance: 2100 mm
Y axis mobile distance: 1000 mm
impact area: 2000 x 1000
fetching speed range: 0 ~ 40 m/s
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Photovoltaic Modules Hail Impact Tester Equipment IEC61215 Standard

Photovoltaic Modules Hail Impact Tester Equipment IEC61215 Standard


Photovoltaic Modules Hail Impact Test


IEC61215 Photovoltaic Modules Hail Impact Testing Machine Environmental Test Chamber


Description

Component hail impact testing machine Applicable standards: IEC61215, IEC61646, UL1703 standard requirements

Purpose: verify component hail impact resistance ability, make artificially hockey is used for simulating the hail, and with constant speed impact component, simulate the hail climate impact on components.


Technical specifications:

1, the launcher

A, power supply, compressed air

B, pressure: 6 ~ 8 bar

C, ice hockey: manual single loading

D, the barrel length: about 940 mm

E, the barrel can be replaced

2, mobile positioning device

A, X axis movement distance: 2100 mm

B, Y axis mobile distance: 1000 mm

C, positioning accuracy of 1 mm or less

D, the impact area of 2000 x 1000 mm

E, guide way: high quality imported guide rail

F, driving way: imported servo motor + synchronous wheel

J, positioning control mode: PC control automatic positioning

3, speed measuring system and the principle

A, through the determination of ice hockey through infrared speed measuring sensor, fetching infrared was interrupt time t at the same time, according to the V = S/t calculate flight speed

B, speed measuring device with high precision infrared speed sensor

C, infrared velocity sensor precision is + / - 5%

D, fetching speed range 0 ~ 40 m/s

E, ice hockey speed: 23.0 m/s + / - 5%;27.2 m/s + / - 5%;30.7 m/s plus or minus 5%

4, hockey preparation ways and mold

A, will be filled with water after ice hockey mould in the refrigerator freezer, after being ice water cooling, separate mould remove ice hockey, placed Yu Bingqiu tanks cold standby.

B, die not easy expansion deformation of the special material

C, lumen diameter 25 mm < 1%;35 mm < 1%;45 mm < 1%

D, exactly six ice hockey;With two sets of ice hockey mold

E, the mould cavity processing technology adopts high precision CNC numerical control machine

F, ice hockey, 25 mm diameter < 5%;35 mm < 5%;45 mm < 5%

G, ice hockey, weight 7.53 g < 5%;20.7 g < 5%;43.9 g < 5%

H, refrigerator - 10 ℃

Quality Photovoltaic Modules Hail Impact Tester Equipment IEC61215 Standard for sale
Send your message to this supplier
 
*From:
*To: Dongguan Kingpo Technology Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0