Sign In | Join Free | My hardware-wholesale.com
hardware-wholesale.com
Products
Search by Category
Home > Warehouses >

Structural Cold Rolled Q235B Prefabricated Metal Buildings

Categories Steel Structure Construction
Brand Name: KAFAFAB
Model Number: Steel structure
Certification: BV,SGS
Place of Origin: China
MOQ: 20T
Price: Negotiate
Supply Ability: 2000T/MONTH
Delivery Time: 6 weeks
Packaging Details: Nude pack or steel pallet
Material: Welded H beam, angle steel round bar,pipe
Paint: Alkyd primer, DFT 80UM
Structure: Gable frame
Application: warehouse frame
Grade: Q235B Q345B
Purlin: cold rolled galvanized C/Z purlin
Life time: Up to 50 years
Color: As per requirement
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Structural Cold Rolled Q235B Prefabricated Metal Buildings

Seismic prefabricated steel structure


Steel structure construction


Structural steel consists of the steel work for buildings, structures and pipe supports. Structural steel also consists of steel work for the farming of bridge connections between structures and equipment inside and outside the building. Construction of steel framed structures includes construction of its foundations, columns , beams and floors systems. Construction phases of structural steel frame are discussed.


Main parts of the steel structures and technical parameters:


Main Steel Frame System
Main structureH section steel Q345, alkyd painting, two primary painting, two finish painting.
Roof purlinXZ160*60*20*2.5, galvanized
Wall purlinXZ160*60*20*2.5, galvanized
Intensive boltGrade 10.9
Turn buckle boltM20+2, steel Q235, processing
Anchor boltM24, steel Q235, processing
Ordinary boltGalvanized bolt M20
Ordinary boltGalvanized bolt M12
Brace nutGalvanized bolt M12
Bracing System
Cross braceΦ20 round steel bar Q235, process and painted (alkyd painting)
Angle braceL50*5 angle steel Q235, process and painted (alkyd painting)
Column bracingΦ25 round steel bar Q235, process and painted (alkyd painting)
Tie barΦ127*3 steel pipe Q235, process and painted (alkyd painting)
Batter braceΦ32*2.5, Φ12 round steel bar Q235, process and painted (alkyd painting)
Wall & Roof System
Roof panelCorrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Wall panelCorrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU)
Edge cover0.4mm color plate, angle Alu.
Fittings & accessoriesNails, glue etc.
Unpowered ventilatorDiameter Φ600, stainless steel
Sky lighting band1.2mm FRP, double layer
Sliding doorsandwich panel door
Roof drainage system
Gutter0.5mm color steel plate
Rainspout pipesΦ110 PVC pipe

The construction procedure of steel frame structure is as follows:


Steel frame structure foundation construction

Steel column structure

Erect steel beams

Floor system used in construction of steel frame structure

Steel frame


Steel frame structure foundation construction


The construction of the steel frame structure begins with the construction of its foundation. Generally, the type of foundation required for a given structure is based on the bearing capacity of the soil.


Soil surveys including ground and underground exploration are used to assess the condition of the soil where the steel frame structure is located.


For example, when applying medium or low loads, it is recommended to use reinforced concrete bearing pads or strip foundations. These foundation types transfer loads to the soil that can support the transferred loads.

Reinforced concrete pressure pad foundation for steel frame structure


If the soil strength is poor and the applied load is large, it is recommended to consider a pile foundation. The pile foundation transfers the load of the structure to the hard soil.


Steel Column Construction


The next step of steel frame construction is the placement of steel columns. The section of the steel is specified based on the load imposed.


There are various sizes of steel column section to choose and these steel columns are commonly produced in advance.


The most significant point in column installation is the connection between foundation and column and splices between columns.


Regarding foundation to column joints, base plates are welded to the end of columns. The most desired shape of base plate is square and rectangular shape. Typical details of column to foundation connection are shown in Figure-6.


It should be known that, the most desired shape of base plate is rectangular and square shape because such plates provide largest spacing between the bolts which is desirable.


Erection of steel beams


Various precast beam sections can be used for building multi-story steel frame structures. Beams usually transfer loads from the floor and roof to the columns.


The maximum span of steel beam members is 18m, but the most common steel beam span ranges from 3m to 9m.


When erecting steel beams, you will encounter column-to-beam connections and beam-to-beam connections. The type of column-to-beam connection is different, which is selected according to the type of load applied to the column-to-beam connection.

Quality Structural Cold Rolled Q235B Prefabricated Metal Buildings for sale
Send your message to this supplier
 
*From:
*To: Qingdao KaFa Fabrication Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0