Sign In | Join Free | My hardware-wholesale.com |
|
Categories | Steel Structure Workshop |
---|---|
Brand Name: | KXD |
Model Number: | S-0049 |
Certification: | CE, ISO, SGS |
Place of Origin: | Qingdao, China |
MOQ: | 500 square meters |
Price: | US$ 50-80 per square meter |
Payment Terms: | L/C,T/T |
Supply Ability: | 3000 tons per month |
Delivery Time: | 30-40 working days |
Packaging Details: | bulk for steel panels, steel pallet for steel structure, wooden box for small installing accessories |
Dimensions: | Customers' Requirement |
Door: | Sliding door or rolling door |
Color: | Client's Request |
Visit: | Workshop Visit And Check Available |
Surface: | Hot-dip Galvanized / Painted |
Frame: | Steel structure |
Lifetime: | over 50 years |
Structure Type: | High Strength Steel Structure Frame |
Model No: | KXD-SSB130 |
Prefabrication: | Off-site |
Installation: | Fast |
Company Info. |
Qingdao KXD Steel Structure Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
Steel Structure Buildings:
Pre-engineered steel buildings are buildings made of steel structures and fabricated and installed according to pre-specified architectural and technical drawings. The process of making finished products (with a combination of inspection and quality control steps) goes through 3 main stages: Design, Fabrication of components and Erection at the site. The entire steel structure can be produced synchronously and then delivered to the construction site in a relatively short time.
The architectural works that often use this type of house include factories, warehouses, galleries, supermarkets, commercial buildings, high-rise buildings, etc.
Steel structure load-bearing:
The frame load-bearing structure is a load-bearing system composed of a horizontal frame and a longitudinal connecting member, and the wall only serves as an enclosure. It is suitable for large spans, high plants, and large crane loads. The load-bearing framework is made of steel plate or hot-rolled steel through cutting and welding.
The horizontal framework of the factory building includes roof beams (or roof truss), columns, and foundations. It bears the loads from skylights, roofs, walls, and other parts, as well as its weight, various loads generated by cranes, and longitudinal wall wind loads. These loads are transmitted to the foundation through the transverse framework through the columns.
The longitudinal connecting components are connected by the roof purlins, wall beams, tie rods, supports, etc. to the horizontal frame to form a single-story industrial building space system. They are mainly to ensure the stability of the transverse framework, bear the tension load, and transmit it to the foundation through the column.
Steel Frame | H section steel | Q235/Q345 steel plate thickness: 8-30mm |
Welding | Automatic submerged arc welding | |
Rust removal | Sand blasting | |
Surface finish | Alkyd / Epoxy paint or hot dipping galvanize | |
High strength bolt | M20,Grade 10.9 | |
Supporting System | Angle brace | L50x4,Steel Q235, processed and painted |
Horizontal brace | Φ20, Steel Q235, processed and painted | |
Column brace | Φ20, Steel Q235, processed and painted | |
Tie beam | Φ89*3, Steel Q235, processed and painted | |
Ordinary bolt | M12 Galvanized bolt | |
Roof | Purlin | C/Z purlin, Q235b, galvanized and painted |
Roof panel | Insulated sandwich panel or corrugated steel sheet | |
Accessories | sealing, self-tapping screws, etc. | |
Edge cover | steel sheet trimming | |
Gutter | Stainless steel / galvanized sheet | |
Down pipe | Φ110PVC | |
Walls | Purlin | C/Z sectional steel, Q235b, galvanized 100-275g |
Wall | Insulated sandwich panel or corrugated steel sheet | |
Accessories | sealing, self-tapping screws, etc. | |
Edge cover | steel sheet trimming | |
Door and window | Different sizes and types are possible to custom. | |
Additional option | Skylight panel; Roof ventilator; Parapet; Glass curtain wall; Decorative aluminum panel |
Processing Steps of Prefabricated Steel Structure Buildings:
Planning and Design
Prefabricated steel buildings starts with a detailed planning and design phase. During this stage, the project’s requirements are identified, and the building’s specifications are established. Factors such as size, layout, and intended usage are considered to ensure that the final design meets the client’s needs. The planning phase also includes obtaining necessary permits and approvals, as local regulations may impact the building’s design.
Fabrication in the workshop
Once the design is finalized, the components are manufactured in a factory. The use of advanced technology in the manufacturing process ensures that the components are of high quality and precisely engineered for quick assembly.
On-Site Assembly
After the prefabricated components are transported to the site, the assembly process begins. Since the parts are pre-engineered, they fit together seamlessly, making the installation process much faster than traditional construction methods. A skilled team of workers assembles the steel frame, attaches the wall panels, and installs the roofing system. Depending on the size and complexity of the building, the assembly process can take anywhere from a few days to a few weeks.
Your Building details confirm to get the design & quotation:
Size | Length × Width × Length |
Building Application | its exact usage or special requirements |
Roof & Wall material | Steel sheet ? Insulated Panel ? Decorative Panel? |
Crane | yes or not? Ton? |
Wind Load | wind speed km/h or m/s or mph? |
Snow Load | snow weight kg/m2 or snow thickness or Kn/m2? |
Door & Window | Sizes? Quantity? Layout? |
Inner Layout | Partition room? |
More options | Parapet? Skylight? Ventilation? Canopy? Glass wall curtain? |
![]() |